Work out how many cubic yards of concrete or how many 80, 60 or 40 lb bags you need for a slab, footing, column or stairs, with waste and cost.

ft
ft
in
$
$
Concrete needed (incl. 10% waste)
1.36 cubic yards
Exact volume1.235 yd³ · 33.3 ft³ · 0.94 m³
80 lb bags62
60 lb bags82
40 lb bags123

Ready-mix trucks usually have a 1 yd³ minimum and charge short-load fees under ~4 yd³. Bagged mix is practical up to about 1 yd³ (≈ 45 bags of 80 lb).

How to use the concrete calculator

Pick the shape of your pour, enter the dimensions, and the calculator gives the volume in cubic yards (the unit ready-mix is sold in), cubic feet and cubic metres, plus how many bags of pre-mix you’d need. A waste allowance is added by default because sub-grades are never perfectly level. Enter prices to compare ready-mix against bagged concrete.

The maths

volume (cu ft) = length (ft) × width (ft) × thickness (ft)
cubic yards   = cubic feet ÷ 27

Thickness is usually quoted in inches, so divide by 12 first. A 10 × 12 ft patio at 4 inches: 10 × 12 × (4 ÷ 12) = 40 cu ft = 1.48 cu yd.

For round columns and piers: π × (diameter ÷ 2)² × height. A 12-inch (1 ft) diameter pier 4 ft deep is π × 0.5² × 4 = 3.14 cu ft.

For stairs, each step is treated as a block the full width of the stairs, one run deep and as tall as its height above the ground — so step 3 of a 7-inch rise is 21 inches tall. The calculator sums the steps.

Application Thickness
Sidewalk, patio, shed base 4 in
Residential driveway 5–6 in
Garage floor 4–6 in
Footing for a wall or deck post 8–12 in, width ≥ 2 × wall thickness
Slab for heavy equipment 6–8 in with rebar

Always check local building codes for footings — the required depth depends on the frost line in your area.

Bags vs ready-mix

Bagged mix Ready-mix truck
Best for Up to ~1 cu yd (posts, small pads, repairs) 1 cu yd and up
Cost ~$5–7 per 80 lb bag ≈ $225–315 per yard ~$150–200 per yard + delivery, short-load fee below 3–4 yd
Effort Mixing 45 bags per yard by hand is a full day’s work Poured in minutes; you need helpers ready to spread and finish
Consistency Varies batch to batch Uniform, and strength-rated (e.g. 3,000–4,000 psi)

Before you pour

  • Order 5–10% extra. Running out mid-pour creates a cold joint; leftover is a minor cost.
  • Prepare the base: compacted gravel 4 inches deep under slabs, and forms braced to resist the weight of wet concrete (about 150 lb per cubic foot).
  • Reinforce driveways and larger slabs with wire mesh or rebar; add control joints every 8–12 ft to manage cracking.
  • Weather: avoid pouring below 40°F or in heavy rain; in hot weather, work fast and keep the surface damp while it cures.
  • Measure the area first with the square footage calculator if the shape is irregular.

Frequently asked questions

How much concrete do I need for a 10×10 slab?

At the standard 4-inch thickness, a 10 × 10 ft slab is 33.3 cubic feet, or 1.23 cubic yards. With a 10% allowance for uneven ground and spillage, order 1.35 yards — or about 62 bags of 80 lb pre-mix.

How many 80 lb bags make a cubic yard?

About 45. An 80 lb bag yields roughly 0.6 cubic feet; a 60 lb bag 0.45; a 40 lb bag 0.3. That's why bagged mix stops making sense above about one cubic yard.

How thick should a slab be?

4 inches for patios, sidewalks and shed floors; 5–6 inches for driveways and garage floors that carry vehicles; footings are usually 8–12 inches thick and at least as wide as the wall is thick, below the frost line.

Should I order ready-mix or use bags?

Under about 1 cubic yard, bags are cheaper and simpler. Above that, a ready-mix truck saves hours of mixing and gives a consistent pour, though most suppliers charge a short-load fee for less than 3–4 yards.